Bruce Watson
June 11th, 2011, 10:37 AM
Production Premium CS5
Client wanted an additional 10 seconds added to vid. I did this in PPro, then ran the old Encore project to make a DVD. I thought dynamic link would take care of it -- but it didn't. Good thing I watched the DVD end-to-end before handing it off!
When I look in Encore's project panel, I see the dynamically linked PPro sequence at the correct length, but the Encore timeline is the same length it was before (which is 10 seconds too short now).
So... how do I lengthen a timeline in Encore CS5? I've read the manuals, searched the 'net, searched Adobe, searched for tutorials... Anyone know how to lengthen a timeline?
Client wanted an additional 10 seconds added to vid. I did this in PPro, then ran the old Encore project to make a DVD. I thought dynamic link would take care of it -- but it didn't. Good thing I watched the DVD end-to-end before handing it off!
When I look in Encore's project panel, I see the dynamically linked PPro sequence at the correct length, but the Encore timeline is the same length it was before (which is 10 seconds too short now).
So... how do I lengthen a timeline in Encore CS5? I've read the manuals, searched the 'net, searched Adobe, searched for tutorials... Anyone know how to lengthen a timeline?