Kevin Richard
September 19th, 2007, 04:34 PM
I'm rendering a project which contains several nested projects but not multiple nest or even parallel nests... basically it's a 1 hour nested project of 1 video file and 1 stereo audio file (two plugins on the video files 6 channel color adj tool and the regular color corrector... and broadcast safe on the overall project) that is layered with 4 mono files and 1 stereo file (all of these have a decent amount of eq'ing, compression, limiting going on). After that I have 1 hour of a few(3) nested projects dropped one after each other with just a little Audio cleaning done on each, no color correction or anything on those (all pre-edited/rendered before I got them).
I did a batch render to mpeg2 dvda template and ac3 stereo dvd template and selected render regions (obviosly I marked regions on each of these sections mentioned above.)
I hit reneder and it's been going for about 1 hour and 45 mins, it still has ZERO percent complete and saying like 17 hours estimated time and counting.
I normally can render a 2+ hour file in around 10 hours (that has about the same amount of color correcting and audio processing done).
*Vegas 7, Intel 3.06 ghz (hyper threading enabled), 1.5gigs ram (about 340mb for render preview in options) All my source media is on a non-system drive (SATA1) and I'm rendering to my system drive (regular ATA), though it only has 13gigs free!*
Anyone know what's the deal? is that right? I'm thinking I would be done faster if I did them all seperately.
*edit* Now it's up to 24 hours... I'm gonna stop this now and just do it individually. This is my first time doing nested projects... I certainly hope that isn't causing this.
I did a batch render to mpeg2 dvda template and ac3 stereo dvd template and selected render regions (obviosly I marked regions on each of these sections mentioned above.)
I hit reneder and it's been going for about 1 hour and 45 mins, it still has ZERO percent complete and saying like 17 hours estimated time and counting.
I normally can render a 2+ hour file in around 10 hours (that has about the same amount of color correcting and audio processing done).
*Vegas 7, Intel 3.06 ghz (hyper threading enabled), 1.5gigs ram (about 340mb for render preview in options) All my source media is on a non-system drive (SATA1) and I'm rendering to my system drive (regular ATA), though it only has 13gigs free!*
Anyone know what's the deal? is that right? I'm thinking I would be done faster if I did them all seperately.
*edit* Now it's up to 24 hours... I'm gonna stop this now and just do it individually. This is my first time doing nested projects... I certainly hope that isn't causing this.