|
|||||||||
|
Thread Tools | Search this Thread |
August 5th, 2004, 10:13 AM | #856 |
New Boot
Join Date: Oct 2003
Location: Monmouth Junction,NJ,US
Posts: 7
|
I also have a gig of memory, and depending on what effects i used premiere would actually start paging. I have premiere 6.5, 1.0 and 1.5 and yes, 1.5 does have much better memory usage than 1.0.
|
August 5th, 2004, 10:15 AM | #857 |
Trustee
Join Date: Mar 2004
Location: Carlsbad CA
Posts: 1,132
|
mp3 is an old-skool codec that isn't nearly as efficient as some of the newer audio codecs... pretty much the same goes for sorensen... if you don't need the quicktime format itself, you'll get higher quality for the same bandwidth with windows media.
|
August 5th, 2004, 10:47 AM | #858 |
Regular Crew
Join Date: Jun 2004
Location: East Midlands
Posts: 137
|
I've just ordered the upgrade to 1.5. Had nothing but pain and trouble with ppro 1.0 with the matrox card. Hopefully i will follow in your footsteps with 1.5. Can't wait!
|
August 5th, 2004, 11:07 AM | #859 |
Regular Crew
Join Date: Aug 2002
Location: Atlanta, Georgia
Posts: 1,892
|
Huge Source files & long projects in Premiere
The most footage that I have loaded into my NLE at one time is 12 hours in 1 hour increments. I have found that Premeire, at least 5.1c, crashes when a clip that is more than an hour long is placed in the timeline when the audio track is expanded for band level adjustment or whatever. I cut with Premeire 5.1c on the desktop which is what this monster project was done with and 6.5 on the laptop. Now, this desktop is configured and used only as an editor and that's it. I don't run any other programs, especially when editing, or even allow it to access the internet for obvious reasons. My desktop PC/NLE, an IBM Intellistation, has twin 600 mhz P3 processors and only 512 megs of RAM but I do have two dedicated 10K RPM SCSI 146 gig video drives for fast seek times which allows for around 27 hours of video to be stored even after formatting. I have found that Premeire, at least 5.1, starts to act up when a project nears or exceeds an hour in length. I attempted to create a two hour project, mentioned above, and got the sh!t scared out of me when it started freezing up shortly into the second hour of the project. So, I found a natural break in the program content and split the project in half. Once I finished the second half, I held my breath and imported the second half into and at the tail of the first half just for the export to tape. Premeire and/or the PC also could not handle rendering the effects/filters all at once. So I had to render the entire timeline in sections. It worked but before I figured out the solution, I was really nervous. As far as short format projects, I never have any problems.
|
August 5th, 2004, 12:38 PM | #860 |
RED Code Chef
Join Date: Oct 2001
Location: Holland
Posts: 12,514
|
Although I think Windows Media can do some great stuff I have
to disagree about the Sorenson 3 codec. Look at the stuff Apple is doing with those movie trailers. Awesome quality at more than managable sizes in my humble opinion.
__________________
Rob Lohman, visuar@iname.com DV Info Wrangler & RED Code Chef Join the DV Challenge | Lady X Search DVinfo.net for quick answers | Buy from the best: DVinfo.net sponsors |
August 6th, 2004, 02:32 AM | #861 |
Wrangler
Join Date: Jan 2002
Location: Hampshire, England
Posts: 1,545
|
Hi Abby,
You can use the audio mixer to pan the audio to the left or right, on a per track bases. So say that you want audio track 1 to be on the left side, then you simply turn the pan knob to the left hand side (L), when you then play the audio back it should only appear on the left. Hope this helps,
__________________
Ed Smith Hampshire, UK Good things come to those who wait My Skiing web www.Frostytour.co.uk For quick answers Search dvinfo.net | The best in the business: dvinfo.net Sponsors |
August 6th, 2004, 02:36 AM | #862 |
Regular Crew
Join Date: Mar 2003
Location: Amsterdam NL -Turnhout BE
Posts: 158
|
Have you tried to make a copyfile of the project in the project folder.
Call it project-b and try to open it. The advantage is that it has to reconform the audio and recalculate the transitions.The chance that it helps is minor but at least the project makes a clean start and you keep the original project as un unaffected reference. If this does not work you can open the project within an ordinary html-editor or XML-editor and look what is wrong or cut it in parts to safe the good part (s). You can also use a unix editor. May be it will safe a lot of work. And while working on a copy you cannot spoil anything. PS For learning make three miniprojects 1. one with one clip and 2. one with two clips and . 3. one with a simple transition and see how they are stored and try to distract one clip form the last one. That is all you need to know to divide your project in parts. If you don't know where it goes wrong in yr big movie divide the movie in 2 equal parts and divide the bad part in 2 and so on. That is the fastest way to find the error. When it is found: cut it out, re-edit it and consolidate the good parts before and after that point within premiere. Added music will be the most difficult thing in splitting I think. |
August 6th, 2004, 03:33 AM | #863 |
New Boot
Join Date: Feb 2004
Location: Accra, Ghana
Posts: 15
|
Hi Ed,
thanks for your reply. I haven't had to deal with audio too much with my previous projects, so I'm a newbie in that department. I will try what you suggested. Thanks again |
August 9th, 2004, 11:31 AM | #864 |
MPS Digital Studios
Join Date: Apr 2003
Location: Palm Beach County, Florida
Posts: 8,531
|
Premiere 6 question
I'm using an old Premiere 6 PC NLE and having problems. I needed to delete the last 1/4 of my project (copy I'm working on)because things got out of sync. I want to take the last 1/4 from the original, which is in sync, and copy that portion and then paste it into the copy project. How do I do that?
Thanks, heath
__________________
My Final Cut Pro X blog |
August 9th, 2004, 11:46 AM | #865 |
MPS Digital Studios
Join Date: Apr 2003
Location: Palm Beach County, Florida
Posts: 8,531
|
one other thing, I can't open two projects at once, the original and the copy. I think that's why I can't get the copy and paste from the last 1/4 of the original into the last 1/4 of the copy.
HELP! thanx, heath
__________________
My Final Cut Pro X blog |
August 9th, 2004, 11:52 AM | #866 |
Trustee
Join Date: Mar 2004
Location: Carlsbad CA
Posts: 1,132
|
the source footage that's used for those quicktime movie trailers is full-on pro stuff... they better look good!
since there isn't any basis for comparison, wrt those movie trailers, you have to test the formats with your own source footage. |
August 9th, 2004, 11:53 AM | #867 |
Major Player
Join Date: Aug 2003
Location: Canada
Posts: 224
|
I thought u could import(but not open) projects (as After Effects can).
I may be wrong. |
August 9th, 2004, 11:57 AM | #868 |
MPS Digital Studios
Join Date: Apr 2003
Location: Palm Beach County, Florida
Posts: 8,531
|
I don't use PRemiere at all, so can you explain a little more?
thanx, heath
__________________
My Final Cut Pro X blog |
August 9th, 2004, 12:03 PM | #869 |
Major Player
Join Date: Aug 2003
Location: Canada
Posts: 224
|
Havent used Premeire for a long while.
But in After Effects you can import one project into another like any other media e.g. quicktimes,pix, audio etc. The imported project will nest in your new project in its own sequence and bin. See if that works. (not 100% sure myself) |
August 9th, 2004, 12:06 PM | #870 |
Capt. Quirk
Join Date: Apr 2002
Location: Middle of the woods in Georgia
Posts: 3,596
|
Try exporting the part you want as an avi. That will lock audio and video. Sorry... the best I can come up with.
__________________
www.SmokeWagonLeather.us |
| ||||||
|
Thread Tools | Search this Thread |
|